Q-2, r. 9.01 - Design code of a storm water management system eligible for a declaration of compliance

Full text
115. The emergency weir must have a capacity allowing the discharge of the peak runoff flow entering the retention system and associated with an event having a 100-year return period.
O.C. 871-2020, s. 115.
In force: 2020-12-31
115. The emergency weir must have a capacity allowing the discharge of the peak runoff flow entering the retention system and associated with an event having a 100-year return period.
O.C. 871-2020, s. 115.